Clinic fit-out in Sharjah & Dubai
Spaces that pass inspection and put patients at ease. Dental and medical clinics designed, built and handed over by one team, with layouts drawn to the health authority’s rules.
- Layouts to the authority’s rules
- Equipment-ready rooms
- Phased so you keep seeing patients

Reception, feature wall and coffee counter, aiHealth Medical Center, Sharjah.
Designed the way a clinic is used
Healthcare is where we started. Our group runs its own medical centre, so we design clinics the way they are used: by the doctor between patients, the nurse with a tray in her hands and the cleaner at the end of the day.
A clinic interior is not an ordinary office fit-out. Room sizes, sinks, flooring, ventilation and waste routes are all things the health authority inspects. The team drawing your rooms is the same team filing your licence, so the requirements arrive inside the drawings.
What we design for
- 01
Layouts to the authority’s rules
Room sizes, clean and dirty flows, sinks, sterilisation and waste routes drawn to the health authority’s requirements.
- 02
Equipment-ready rooms
Power, water, air and data where the dental chair, the X-ray and the scanner need them, with the clearances the equipment asks for.
- 03
Finishes that clean
Seamless, wipeable surfaces and coved corners in treatment areas; warmth and comfort in the waiting room.
- 04
Phased refits
Work planned area by area so a working clinic keeps seeing patients.

Clinics, medical centres, pharmacies and laboratories
New clinics and change of use, treatment rooms, sterilisation and waste routes, and phased refits of a working clinic.
How the work runs, from design to aftercare
Most cost overruns start with a decision made on site, so every decision is made on paper first.
- 01
Design
We measure the unit, then settle the layout, the services and every finish in drawings, 3D views and samples, with a priced bill of quantities. The build follows a plan you have already seen, approved and priced.
- 02
Site works
The services go in first: electrical routes, air conditioning, water and drainage, set out to the drawings. Then the partitions, ceilings, floors and joinery.
- 03
Checks
Every service is photographed in place, matched to the drawings and approved before boards, ceilings or floors cover it.
- 04
Handover
We run the quality checks and the snag list, and hand over a space ready for its opening inspections, with the photo record of what is behind each wall.
- 05
Aftercare
Under a management contract we keep the place in shape: planned maintenance, requests from your phone and, for a clinic, a shop or a venue, the marketing that keeps people coming in.
From a recent fit-out
Photographed on site in November 2025, before the ceilings and floors closed.



Approvals
Drawings go to the landlord and to the authorities that cover the site, through the licensed contractor named on the permits where the emirate requires one.
Building in Dubai. Fit-out works in Dubai are permitted by Dubai Municipality or the relevant free-zone authority, together with Dubai Civil Defence and the landlord. We lead the design, the cost and the site, and the works are carried out and permitted through a fit-out contractor licensed in Dubai, working to our drawings and under our supervision. You still have one team and one point of contact.
To prepare your proposal
- The unit location, its size and the landlord or master developer
- Photos of the space and any drawings you already hold
- The landlord’s fit-out guide, if you have it
- Your target opening date and expected capacity
- The look you have in mind: a few places or pictures you like
- Your budget range, so we design to it from the start
What you receive
A floor plan, 3D views and a proposal that sets out the scope, the programme and the price, line by line. Design can be agreed on its own before any build commitment.
We reply within one working day and visit the site at a time that suits you.
Start your projectQuestions we get asked
Do you draw the layout to the health authority’s requirements?
Yes. Room sizes, clean and dirty flows, sinks, sterilisation and waste routes are drawn to the health authority’s requirements, by the team that files the licence.
Can my clinic stay open during the work?
Usually, yes. We phase the work area by area so you keep seeing patients, and plan the noisy parts around your hours.
Do you work in Dubai as well as Sharjah?
Yes. In Dubai the works are permitted by Dubai Municipality or the relevant free-zone authority, with Dubai Civil Defence and the landlord, and are carried out through a fit-out contractor licensed in Dubai, working to our drawings and under our supervision. You still have one team and one point of contact.
Can you do only the design?
Yes. A floor plan, 3D visuals and a proposal can be a job on their own. You can build with us later, or with anyone.
What do you need from me to start?
The unit location and size, photos and any drawings you hold, the landlord’s fit-out guide if you have it, your target opening date and your budget range. A few photos and a few lines are enough for a first call.
Other spaces we fit out
All design and fit-outTell us about your place
Photos and a few lines are enough to start. We call you within one working day.



